Doosan Babcock
Accessibility Company
  Registration
Sitemap Doosan Power Systems
Search GO
Welding Products
Steam Generation OEM
Plant Testing
Protective Systems
Boiler Support Structures
Boiler Ducting Design
Pipework Design
Boiler Plant Foundation Design
Design Code Assessment
Engineering on Asset Management
Owners' Engineer
Operational Support
HRSG Casing Analysis
Finite Element Analysis
Boiler Plant Hot Structures
Pressure Parts
Nuclear Design
Posiflow™
Environmental Control
Design and Engineering
Manufacturing and Spares
Testing and Design Validation
Asset Lifecycle Services
Inspection and Integrity Assurance
Repair, Maintenance and Construction
Application of CDM Regulations
Doosan Babcock has gained extensive experience throughout the United Kingdom in the role of Planning Supervisor, Principal Contractor and Designer within the Construction and Design Management Regulations 1994.

Our Engineering Design team are highly experienced in the process of risk abatement through the use of Design Risk Assessment.

At a very early stage in the design process the design risk assessment is initiated. The risk assessment is developed from the information contained within the Specification and the Pre Tender/Construction Phase Health and Safety Plan, and is issued with the tender documentation.

On award of contract, the design risk assessment is reviewed, forming the initial topic of the first design review. This theme continues throughout the design process ensuring the risk assessment is reviewed in a series of design reviews held during the life of the project.

Following Regulation 13 our designers are trained to:-

  • Avoid risks in design
  • Deal with causes of risks at source
  • Minimise and control of risks where the risk cannot be removed
  • Consider not only the construction implications but think about the Operational Maintenance and Demolition works
  • Co-operate with the Planning Supervisor

Terms and conditions    Data Protection and Confidentiality